Fields / 30/6-U-3
30/6-U-3
Other, soil drillingPlugged and abandoned
Drilled by Norsk Hydro Produksjon AS, 01.10.1987 to 01.10.1987 (0 days), to 151,6 m.
Water depth-
Total depth151,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
Rig-
Spud01.10.1987
Completed01.10.1987
OperatorNorsk Hydro Produksjon AS
Position60,5954 N, 2,7523 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.