WellplannerNorwegian shelf well data

Fields / 30/7-4

30/7-4

Exploration, wildcatJunked

Drilled by Norsk Hydro Produksjon AS with Polyglomar Driller, 25.01.1977 to 05.02.1977 (11 days), to 778,0 m in the Nordland Group.

Water depth117,0 m
Total depth778,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depthNordland Group
RigPolyglomar Driller
Spud25.01.1977
Completed05.02.1977
OperatorNorsk Hydro Produksjon AS
Position60,4916 N, 2,0568 E

Formations

1 tops reported, measured depth in metres.

GroupsNordland Group, top 141,0 mNordland GpFormations141500778

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/7-60,03 784,0127 °C1,761977
30/7-6 R0,04 115,0127 °C2,101978
30/7-50,0805,0-1,091977
30/7-21,62 591,069 °C1,321975
30/7-11,71 007,0-1,141975
30/4-D-1 AH1,84 500,0--2010
30/4-D-1 H1,84 128,0--2009
30/4-A-72,82 835,0--2014

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"193,036"193,0-
Open hole-305,026"305,0-
Open hole-778,017 1/2"778,0-

Mud weight

4 measurements, one dot each, 1,00 to 1,07 g/cm³ against measured depth, seawater, waterbased.

1,01,10500193,0 m: 1,07 g/cm³, seawater310,0 m: 1,04 g/cm³, waterbased772,0 m: 1,07 g/cm³, waterbased778,0 m: 1,07 g/cm³, waterbased
Show on the mapOpen on FactPages ↗