Fields / 30/8-3
30/8-3
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Norsk Hydro Produksjon AS with West Vanguard, 13.11.1997 to 05.01.1998 (53 days), to 3 720,0 m in the Drake Formation.
Water depth92,5 m
Total depth3 720,0 m MD
Vertical depth3 718,0 m TVD
Bottom-hole temperature135 °C
Max inclination7,4°
Rotary table22,0 m
Formation at total depthDrake Formation
RigWest Vanguard
Spud13.11.1997
Completed05.01.1998
OperatorNorsk Hydro Produksjon AS
Position60,4446 N, 2,6494 E
Formations
32 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 135 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/8-1 A | 2,2 | - | - | - | - |
| 30/8-1 S | 2,2 | 4 688,0 | 151 °C | 2,04 | 1994 |
| 30/8-1 SR | 2,2 | 5 149,0 | 160 °C | 2,04 | 1995 |
| 30/8-A-12 H | 2,6 | 4 834,0 | - | - | 2001 |
| 30/8-A-11 AH | 2,6 | 5 450,0 | - | - | 2002 |
| 30/8-A-11 H | 2,6 | 4 810,0 | - | - | 2002 |
| 30/8-A-13 AH | 2,6 | - | - | - | - |
| 30/8-A-13 H | 2,6 | 5 187,0 | - | - | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 212,0 | 36" | 214,0 | - |
| Pilot hole | - | 440,0 | 9 7/8" | 440,0 | - |
| Surface casing | 13 3/8" | 1 581,0 | 17 1/2" | 1 588,0 | - |
| Intermediate | 9 5/8" | 3 249,0 | 12 1/4" | 3 260,0 | - |
| Open hole | - | 3 720,0 | 8 1/2" | 3 720,0 | - |
Mud weight
17 measurements, one dot each, 1,00 to 1,62 g/cm³ against measured depth, water based.