WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-21 S

30/9-21 S

Exploration, appraisalPlugged and abandonedOil and gas

Drilled by StatoilHydro Petroleum AS with Transocean Winner in Oseberg, 13.03.2008 to 30.04.2008 (48 days), to 4 090,0 m in the Ness Formation.

Water depth106,0 m
Total depth4 090,0 m MD
Vertical depth3 463,0 m TVD
Bottom-hole temperature132 °C
Max inclination50,6°
Rotary table26,0 m
Formation at total depthNess Formation
RigTransocean Winner
Spud13.03.2008
Completed30.04.2008
OperatorStatoilHydro Petroleum AS
Position60,4248 N, 2,6940 E

Formations

27 tops reported, measured depth in metres.

GroupsNordland Group, top 132,0 mNordland GpHordaland Group, top 1 108,0 mHordaland GpRogaland Group, top 2 195,0 mRogaland GpShetland Group, top 2 628,0 mShetland GpCromer Knoll Group, top 3 538,0 mViking Group, top 3 597,0 mViking GpBrent Group, top 3 774,0 mBrent GpFormationsUtsira Formation, top 613,0 mUtsira FmNo Formal Name, top 881,0 mNo Formal NameSkade Formation, top 1 315,0 mNo Formal Name, top 1 350,0 mSkade Formation, top 1 443,0 mNo Formal Name, top 1 525,0 mGrid Formation, top 1 656,0 mNo Formal Name, top 1 727,0 mNo Formal NameBalder Formation, top 2 195,0 mSele Formation, top 2 275,0 mLista Formation, top 2 370,0 mLista FmVåle Formation, top 2 520,0 mEkofisk Formation, top 2 628,0 mHardråde Formation, top 2 675,0 mKyrre Formation, top 2 770,0 mKyrre FmRødby Formation, top 3 538,0 mDraupne Formation, top 3 597,0 mHeather Formation, top 3 656,0 mTarbert Formation, top 3 774,0 mTarbert FmNess Formation, top 3 962,0 m1321 0002 0003 0004 0004 090

Temperature

Reported at total depth132 °C
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient131 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-21 A same well0,04 086,0132 °C1,492008
30/9-28 S2,94 083,0143 °C1,452016
30/9-O-4 H3,0432,0--2014
30/9-O-3 AH3,07 041,0--2022
30/9-O-3 H3,05 243,0--2021
30/9-U-33,0470,0--2014
30/9-O-1 AH3,05 881,0--2022
30/9-O-1 BH3,05 873,0--2022

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"180,036"182,0-
Surface casing20"1 215,026"1 222,01,62 LOT
Intermediate13 3/8"2 123,017 1/2"2 130,01,72 LOT
Intermediate9 5/8"3 671,012 1/4"3 680,01,60 LOT
Open hole-4 090,08 1/2"4 090,0-

Mud weight

18 measurements, one dot each, 1,30 to 1,52 g/cm³ against measured depth, glydril, paratec.

1,31,41,51,601 0002 0003 0004 0001 247,0 m: 1,30 g/cm³, Glydril1 325,0 m: 1,37 g/cm³, Glydril1 494,0 m: 1,39 g/cm³, Glydril1 698,0 m: 1,50 g/cm³, Glydril1 720,0 m: 1,50 g/cm³, Glydril1 873,0 m: 1,50 g/cm³, Glydril2 059,0 m: 1,50 g/cm³, Glydril2 131,0 m: 1,52 g/cm³, Glydril2 188,0 m: 1,39 g/cm³, Paratec2 445,0 m: 1,39 g/cm³, Paratec2 906,0 m: 1,41 g/cm³, Paratec2 930,0 m: 1,41 g/cm³, Paratec3 136,0 m: 1,41 g/cm³, Paratec3 255,0 m: 1,41 g/cm³, Paratec3 379,0 m: 1,41 g/cm³, Paratec3 521,0 m: 1,30 g/cm³, Paratec3 680,0 m: 1,43 g/cm³, Paratec4 090,0 m: 1,52 g/cm³, Paratec
Show on the mapOpen on FactPages ↗