Fields / Oseberg / 30/9-B-26 C
30/9-B-26 C
Development, injectionClosedWater
Drilled by StatoilHydro Petroleum AS with Oseberg B in Oseberg, 05.04.2008 to 24.05.2008 (49 days), to 6 151,0 m.
Water depth109,0 m
Total depth6 151,0 m MD
Vertical depth3 031,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,0 m
Formation at total depth-
RigOseberg B
Spud05.04.2008
Completed24.05.2008
OperatorStatoilHydro Petroleum AS
Position60,4934 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 113 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-26 same well | 0,0 | 4 426,0 | - | - | 1986 |
| 30/9-B-26 A same well | 0,0 | 3 536,0 | - | - | 1997 |
| 30/9-B-26 B same well | 0,0 | 5 553,0 | - | - | 1997 |
| 30/9-B-27 | 0,0 | 3 463,0 | - | - | 1986 |
| 30/9-B-27 A | 0,0 | 3 512,0 | - | - | 1997 |
| 30/9-B-27 B | 0,0 | 6 075,0 | - | - | 1997 |
| 30/9-B-27 C | 0,0 | 5 447,0 | - | - | 2009 |
| 30/9-B-27 D | 0,0 | 5 985,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.