Fields / Oseberg / 30/9-B-44 C
30/9-B-44 C
Development, productionProducingOil
Drilled by Statoil Petroleum AS with Oseberg B in Oseberg, 26.11.2010 to 08.01.2011 (43 days), to 6 260,0 m.
Water depth109,0 m
Total depth6 260,0 m MD
Vertical depth2 572,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigOseberg B
Spud26.11.2010
Completed08.01.2011
OperatorStatoil Petroleum AS
Position60,4933 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 96 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-44 same well | 0,0 | 6 268,0 | - | - | 2000 |
| 30/9-B-44 A same well | 0,0 | 7 291,0 | - | - | 2001 |
| 30/9-B-44 B same well | 0,0 | 5 072,0 | - | - | 2010 |
| 30/9-B-45 | 0,0 | 8 225,0 | - | - | 2002 |
| 30/9-B-45 A | 0,0 | 6 594,0 | - | - | 2021 |
| 30/9-B-38 | 0,0 | 5 027,0 | - | - | 1992 |
| 30/9-B-38 A | 0,0 | 5 831,0 | - | - | 2000 |
| 30/9-B-38 B | 0,0 | 7 082,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.