30/9-B-5
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 03.11.1992 to 17.11.1992 (14 days), to 743,0 m.
Water depth109,0 m
Total depth743,0 m MD
Vertical depth743,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud03.11.1992
Completed17.11.1992
OperatorNorsk Hydro Produksjon AS
Position60,4935 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 26 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-5 A same well | 0,0 | 3 968,0 | - | - | 1993 |
| 30/9-B-5 B same well | 0,0 | 4 120,0 | - | - | 1993 |
| 30/9-B-5 C same well | 0,0 | 5 287,0 | - | - | 1993 |
| 30/9-B-5 D same well | 0,0 | 6 050,0 | - | - | 2001 |
| 30/9-B-5 E same well | 0,0 | 6 570,0 | - | - | 2019 |
| 30/9-B-5 F same well | 0,0 | - | - | - | 2026 |
| 30/9-B-6 | 0,0 | 5 977,0 | - | - | 1993 |
| 30/9-B-6 A | 0,0 | 7 670,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.