Fields / Oseberg Sør / 30/9-F-14
30/9-F-14
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with West Delta in Oseberg Sør, 08.04.1999 to 07.05.1999 (29 days), to 3 438,0 m.
Water depth101,0 m
Total depth3 438,0 m MD
Vertical depth2 947,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigWest Delta
Spud08.04.1999
Completed07.05.1999
OperatorNorsk Hydro Produksjon AS
Position60,3902 N, 2,7970 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 106 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-F-14 A same well | 0,0 | 4 020,0 | - | - | 1999 |
| 30/9-F-14 B same well | 0,0 | 5 808,0 | - | - | 2008 |
| 30/9-F-18 | 0,0 | 4 188,0 | - | - | 1999 |
| 30/9-F-18 A | 0,0 | 5 368,0 | - | - | 1999 |
| 30/9-F-18 B | 0,0 | 5 235,0 | - | - | 2014 |
| 30/9-F-13 | 0,0 | 6 742,0 | - | - | 2007 |
| 30/9-F-13 A | 0,0 | 8 164,0 | - | - | 2007 |
| 30/9-F-13 B | 0,0 | 6 419,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.