Fields / Oseberg Sør / 30/9-F-15
30/9-F-15
Development, productionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Oseberg Sør in Oseberg Sør, 19.12.2000 to 09.01.2001 (21 days), to 1 005,0 m.
Water depth101,0 m
Total depth1 005,0 m MD
Vertical depth956,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table67,0 m
Formation at total depth-
RigOseberg Sør
Spud19.12.2000
Completed09.01.2001
OperatorNorsk Hydro Produksjon AS
Position60,3902 N, 2,7971 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 33 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-F-15 A same well | 0,0 | 930,0 | - | - | 2004 |
| 30/9-F-15 B same well | 0,0 | 896,0 | - | - | 2008 |
| 30/9-F-15 C same well | 0,0 | 980,0 | - | - | 2024 |
| 30/9-F-16 | 0,0 | 6 685,0 | - | - | 2000 |
| 30/9-F-16 A | 0,0 | 7 360,0 | - | - | 2000 |
| 30/9-F-16 B | 0,0 | 4 468,0 | - | - | 2015 |
| 30/9-F-11 | 0,0 | 858,0 | - | - | 2003 |
| 30/9-F-11 A | 0,0 | 922,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.