Fields / Oseberg Sør / 30/9-F-2
30/9-F-2
Development, injectionPluggedCuttings
Drilled by Norsk Hydro Produksjon AS with Oseberg Sør in Oseberg Sør, 17.01.2001 to 28.01.2001 (11 days), to 1 525,0 m.
Water depth101,0 m
Total depth1 525,0 m MD
Vertical depth1 296,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table67,0 m
Formation at total depth-
RigOseberg Sør
Spud17.01.2001
Completed28.01.2001
OperatorNorsk Hydro Produksjon AS
Position60,3903 N, 2,7970 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 45 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-F-2 A same well | 0,0 | 1 817,0 | - | - | 2006 |
| 30/9-F-2 B same well | 0,0 | 1 611,0 | - | - | 2008 |
| 30/9-F-2 C same well | 0,0 | 1 999,0 | - | - | 2018 |
| 30/9-F-3 | 0,0 | 285,0 | - | - | - |
| 30/9-F-6 | 0,0 | 3 210,0 | - | - | 2002 |
| 30/9-F-1 | 0,0 | 7 584,0 | - | - | 2001 |
| 30/9-F-1 A | 0,0 | 7 935,0 | - | - | 2002 |
| 30/9-F-7 | 0,0 | 1 487,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.