Fields / Oseberg Sør / 30/9-J-13 H
30/9-J-13 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Bideford Dolphin in Oseberg Sør, 09.06.2005 to 14.07.2005 (35 days), to 2 842,0 m.
Water depth102,0 m
Total depth2 842,0 m MD
Vertical depth2 549,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud09.06.2005
Completed14.07.2005
OperatorNorsk Hydro Produksjon AS
Position60,3545 N, 2,9001 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 92 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-J-13 AH same well | 0,0 | 4 376,0 | - | - | 2009 |
| 30/9-J-13 BH same well | 0,0 | 3 635,0 | - | - | 2009 |
| 30/9-J-12 H | 0,0 | 5 324,0 | - | - | 2004 |
| 30/9-J-11 AH | 0,0 | 3 690,0 | - | - | 2006 |
| 30/9-J-11 BH | 0,0 | 3 311,0 | - | - | 2006 |
| 30/9-J-11 H | 0,0 | 4 240,0 | - | - | 2005 |
| 30/9-J-14 AH | 0,0 | 5 392,0 | - | - | 2013 |
| 30/9-J-14 BH | 0,0 | 4 751,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.