WellplannerNorwegian shelf well data

Fields / Oseberg Sør / 30/9-J-13 H

30/9-J-13 H

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Bideford Dolphin in Oseberg Sør, 09.06.2005 to 14.07.2005 (35 days), to 2 842,0 m.

Water depth102,0 m
Total depth2 842,0 m MD
Vertical depth2 549,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud09.06.2005
Completed14.07.2005
OperatorNorsk Hydro Produksjon AS
Position60,3545 N, 2,9001 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg Sør gradient36,3 °C/km
Estimated at total depth from the gradient92 °C

The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-J-13 AH same well0,04 376,0--2009
30/9-J-13 BH same well0,03 635,0--2009
30/9-J-12 H0,05 324,0--2004
30/9-J-11 AH0,03 690,0--2006
30/9-J-11 BH0,03 311,0--2006
30/9-J-11 H0,04 240,0--2005
30/9-J-14 AH0,05 392,0--2013
30/9-J-14 BH0,04 751,0--2013

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗