WellplannerNorwegian shelf well data

Fields / Oseberg Sør / 30/9-J-16 H

30/9-J-16 H

Development, injectionPluggedWater

Drilled by Norsk Hydro Produksjon AS with Bideford Dolphin in Oseberg Sør, 18.10.2005 to 09.01.2006 (83 days), to 3 180,0 m.

Water depth102,0 m
Total depth3 180,0 m MD
Vertical depth2 432,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud18.10.2005
Completed09.01.2006
OperatorNorsk Hydro Produksjon AS
Position60,3544 N, 2,9001 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg Sør gradient36,3 °C/km
Estimated at total depth from the gradient88 °C

The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-J-16 AH same well0,03 550,0--2022
30/9-J-16 BH same well0,04 150,0--2023
30/9-J-15 AH0,04 527,0--2023
30/9-J-15 H0,04 489,0--2009
30/9-J-14 AH0,05 392,0--2013
30/9-J-14 BH0,04 751,0--2013
30/9-J-14 CH0,06 312,0--2022
30/9-J-14 H0,04 682,0--2004

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗