30/9-N-11 H
Development, observationPlugged and abandoned
Drilled by Norsk Hydro Produksjon AS with Deepsea Delta in Tune, 02.11.2004 to 14.01.2005 (73 days), to 4 364,0 m.
Water depth93,0 m
Total depth4 364,0 m MD
Vertical depth3 604,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigDeepsea Delta
Spud02.11.2004
Completed14.01.2005
OperatorNorsk Hydro Produksjon AS
Position60,4928 N, 2,6713 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tune gradient | 34,5 °C/km |
| Estimated at total depth from the gradient | 124 °C |
The gradient is the median of 4 released wells in Tune with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-N-11 AH same well | 0,0 | 5 150,0 | - | - | 2005 |
| 30/6-18 | 2,0 | 3 690,0 | 148 °C | 1,42 | 1985 |
| 30/5-2 | 2,3 | 4 076,0 | 139 °C | 1,64 | 1996 |
| 30/9-U-2 | 2,4 | 581,0 | - | - | 2009 |
| 30/9-24 | 2,4 | 3 767,0 | - | 1,47 | 2009 |
| 30/9-L-52 AH | 2,8 | 4 851,0 | - | - | 2015 |
| 30/9-L-52 H | 2,8 | 4 460,0 | - | - | 2015 |
| 30/9-L-51 AH | 2,8 | 5 880,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.