30/9-P-4 H
Development, productionClosedOil and gas
Drilled by Equinor Energy AS with Askepott in Oseberg, 04.01.2021 to 28.02.2021 (55 days), to 4 280,0 m.
Water depth105,0 m
Total depth4 280,0 m MD
Vertical depth3 592,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigAskepott
Spud04.01.2021
Completed28.02.2021
OperatorEquinor Energy AS
Position60,4569 N, 2,6952 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 135 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-P-4 AH same well | 0,0 | - | - | - | - |
| 30/9-26 S | 0,0 | 4 568,0 | - | 1,46 | 2014 |
| 30/9-P-1 AH | 0,0 | 5 199,0 | - | - | 2015 |
| 30/9-P-1 BH | 0,0 | 6 235,0 | - | - | 2021 |
| 30/9-P-1 H | 0,0 | 5 423,0 | - | - | 2014 |
| 30/9-P-3 H | 0,0 | 3 840,0 | - | - | 2015 |
| 30/9-P-2 AH | 0,0 | 5 915,0 | - | - | 2021 |
| 30/9-P-2 H | 0,0 | 4 472,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.