31/2-1
Exploration, wildcatSuspendedOil and gas
Drilled by A/S Norske Shell with Borgny Dolphin in Troll, 17.07.1979 to 09.11.1979 (115 days), to 2 433,0 m in the Hegre Group.
Water depth324,0 m
Total depth2 433,0 m MD
Vertical depth2 433,0 m TVD
Bottom-hole temperature65 °C
Max inclination-
Rotary table24,0 m
Formation at total depthHegre Group
RigBorgny Dolphin
Spud17.07.1979
Completed09.11.1979
OperatorA/S Norske Shell
Position60,7720 N, 3,5544 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 65 °C |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 82 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-1 R same well | 0,0 | 2 434,0 | 65 °C | - | 1981 |
| 31/2-L-13 AY1H | 1,5 | 5 262,0 | - | - | 2006 |
| 31/2-L-13 AY2H | 1,5 | 5 206,0 | - | - | 2006 |
| 31/2-L-13 AY3H | 1,5 | 4 920,0 | - | - | 2006 |
| 31/2-L-13 BY1H | 1,5 | 6 963,0 | - | - | 2018 |
| 31/2-L-13 BY2H | 1,5 | 5 908,0 | - | - | 2018 |
| 31/2-L-13 BY3H | 1,5 | 7 487,0 | - | - | 2018 |
| 31/2-L-13 H | 1,5 | 5 348,0 | - | - | 2000 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 423,0 | 36" | 470,0 | - |
| Surface casing | 20" | 793,0 | 26" | 805,0 | 1,52 LOT |
| Intermediate | 13 5/8" | 1 308,0 | 17 1/2" | 1 322,0 | 1,67 LOT |
| Intermediate | 9 5/8" | 2 061,0 | 12 1/4" | 2 074,0 | 1,60 LOT |
| Open hole | - | 2 433,0 | 8 1/2" | 2 433,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,37 g/cm³ against measured depth, waterbased.