31/2-17 B
Exploration, appraisalSuspendedGas
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Troll, 01.02.1992 to 14.02.1992 (13 days), to 1 838,0 m in the Sognefjord Formation.
Water depth341,0 m
Total depth1 838,0 m MD
Vertical depth1 575,0 m TVD
Bottom-hole temperature80 °C
Max inclination88,8°
Rotary table24,0 m
Formation at total depthSognefjord Formation
RigTransocean 8
Spud01.02.1992
Completed14.02.1992
OperatorNorsk Hydro Produksjon AS
Position60,8825 N, 3,4516 E
Formations
10 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 80 °C |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-17 A same well | 0,0 | 1 924,0 | 85 °C | 1,37 | 1992 |
| 31/2-17 BR same well | 0,0 | 1 843,0 | - | - | 1993 |
| 31/2-17 S same well | 0,0 | 2 220,0 | 80 °C | 1,50 | 1991 |
| 31/2-9 | 0,9 | 1 770,0 | 46 °C | 1,31 | 1982 |
| 31/2-D-9 | 1,4 | 1 760,0 | - | - | 1995 |
| 31/2-O-41 | 1,5 | 1 782,0 | - | - | 2000 |
| 31/2-D-1 AH | 1,9 | 4 220,0 | - | - | 1998 |
| 31/2-D-1 BY1H | 1,9 | 5 111,0 | - | - | 2010 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 451,0 | 36" | 452,0 | - |
| Intermediate | 18 5/8" | 906,0 | 26" | 909,0 | - |
| Intermediate | 13 3/8" | 1 642,0 | 17 1/2" | 1 644,0 | 1,33 LOT |
| Intermediate | 9 5/8" | 1 815,0 | 12 1/4" | 1 838,0 | - |
Mud weight
4 measurements, one dot each, 1,20 to 1,26 g/cm³ against measured depth, oil based.