31/2-D-1 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 01.08.1998 to 14.08.1998 (13 days), to 2 363,0 m.
Water depth339,0 m
Total depth2 363,0 m MD
Vertical depth1 631,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud01.08.1998
Completed14.08.1998
OperatorNorsk Hydro Produksjon AS
Position60,8675 N, 3,4367 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-D-1 AH same well | 0,0 | 4 220,0 | - | - | 1998 |
| 31/2-D-1 BY1H same well | 0,0 | 5 111,0 | - | - | 2010 |
| 31/2-D-1 BY2H same well | 0,0 | 4 632,0 | - | - | 2010 |
| 31/2-D-1 BY3H same well | 0,0 | 4 525,0 | - | - | 2010 |
| 31/2-D-1 CY1H same well | 0,0 | 5 866,0 | - | - | 2022 |
| 31/2-D-1 CY2H same well | 0,0 | 9 392,0 | - | - | 2022 |
| 31/2-D-1 CY3H same well | 0,0 | 9 686,0 | - | - | 2022 |
| 31/2-D-9 | 0,5 | 1 760,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.