31/2-D-2 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 20.12.1995 to 19.01.1996 (30 days), to 4 602,0 m.
Water depth338,0 m
Total depth4 602,0 m MD
Vertical depth1 575,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud20.12.1995
Completed19.01.1996
OperatorNorsk Hydro Produksjon AS
Position60,8585 N, 3,4454 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-D-2 AY1H same well | 0,0 | 4 215,0 | - | - | 2011 |
| 31/2-D-2 AY2H same well | 0,0 | 4 147,0 | - | - | 2011 |
| 31/2-D-2 AY3H same well | 0,0 | 4 478,0 | - | - | 2011 |
| 31/2-D-5 AH | 0,2 | 3 800,0 | - | - | 1997 |
| 31/2-D-5 BY1H | 0,2 | 4 933,0 | - | - | 2015 |
| 31/2-D-5 BY2H | 0,2 | 4 560,0 | - | - | 2015 |
| 31/2-D-5 BY3H | 0,2 | 3 695,0 | - | - | 2015 |
| 31/2-D-5 H | 0,2 | 2 055,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.