WellplannerNorwegian shelf well data

Fields / Troll / 31/2-D-7 H

31/2-D-7 H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 05.03.1996 to 31.03.1996 (26 days), to 3 900,0 m.

Water depth339,0 m
Total depth3 900,0 m MD
Vertical depth1 592,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud05.03.1996
Completed31.03.1996
OperatorNorsk Hydro Produksjon AS
Position60,8558 N, 3,4428 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-D-7 AY1H same well0,05 012,0--2007
31/2-D-7 AY2H same well0,05 680,0--2007
31/2-D-7 AY3H same well0,05 810,0--2007
31/2-D-7 AY4H same well0,04 333,0--2007
31/2-D-7 AY5H same well0,05 497,0--2007
31/2-D-7 AY6H same well0,05 826,0--2007
31/2-D-7 AY7H same well0,05 702,0--2007
31/2-D-7 BY1H same well0,07 991,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗