31/2-D-7 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 05.03.1996 to 31.03.1996 (26 days), to 3 900,0 m.
Water depth339,0 m
Total depth3 900,0 m MD
Vertical depth1 592,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud05.03.1996
Completed31.03.1996
OperatorNorsk Hydro Produksjon AS
Position60,8558 N, 3,4428 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-D-7 AY1H same well | 0,0 | 5 012,0 | - | - | 2007 |
| 31/2-D-7 AY2H same well | 0,0 | 5 680,0 | - | - | 2007 |
| 31/2-D-7 AY3H same well | 0,0 | 5 810,0 | - | - | 2007 |
| 31/2-D-7 AY4H same well | 0,0 | 4 333,0 | - | - | 2007 |
| 31/2-D-7 AY5H same well | 0,0 | 5 497,0 | - | - | 2007 |
| 31/2-D-7 AY6H same well | 0,0 | 5 826,0 | - | - | 2007 |
| 31/2-D-7 AY7H same well | 0,0 | 5 702,0 | - | - | 2007 |
| 31/2-D-7 BY1H same well | 0,0 | 7 991,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.