Fields / Troll / 31/2-E-1 BY1H
31/2-E-1 BY1H
Development, productionPluggedOil
Drilled by StatoilHydro ASA with West Venture in Troll, 22.11.2007 to 11.01.2008 (50 days), to 4 603,0 m.
Water depth331,0 m
Total depth4 603,0 m MD
Vertical depth1 608,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud22.11.2007
Completed11.01.2008
OperatorStatoilHydro ASA
Position60,8003 N, 3,4435 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-E-1 AH same well | 0,0 | 3 919,0 | - | - | 1995 |
| 31/2-E-1 BY2H same well | 0,0 | 4 613,0 | - | - | 2008 |
| 31/2-E-1 CY1H same well | 0,0 | 7 331,0 | - | - | 2018 |
| 31/2-E-1 CY2H same well | 0,0 | 7 575,0 | - | - | 2018 |
| 31/2-E-1 CY3H same well | 0,0 | 7 303,0 | - | - | 2018 |
| 31/2-E-1 H same well | 0,0 | 2 100,0 | - | - | 1995 |
| 31/2-E-4 AY1H | 0,2 | 5 757,0 | - | - | 2015 |
| 31/2-E-4 AY2H | 0,2 | 6 039,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.