31/2-E-6 CH
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 13.08.2002 to 22.08.2002 (9 days), to 2 250,0 m.
Water depth332,0 m
Total depth2 250,0 m MD
Vertical depth1 998,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud13.08.2002
Completed22.08.2002
OperatorNorsk Hydro Produksjon AS
Position60,7976 N, 3,4453 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-E-6 AH same well | 0,0 | 1 740,0 | - | - | 1997 |
| 31/2-E-6 BH same well | 0,0 | 3 355,0 | - | - | 1997 |
| 31/2-E-6 DY1H same well | 0,0 | 4 780,0 | - | - | 2002 |
| 31/2-E-6 DY2H same well | 0,0 | 4 900,0 | - | - | 2002 |
| 31/2-E-6 EY1H same well | 0,0 | 5 025,0 | - | - | 2014 |
| 31/2-E-6 EY2H same well | 0,0 | 4 680,0 | - | - | 2014 |
| 31/2-E-6 EY3H same well | 0,0 | 5 625,0 | - | - | 2014 |
| 31/2-E-6 EY4H same well | 0,0 | 4 725,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.