31/2-K-23 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 28.07.1999 to 12.08.1999 (15 days), to 4 223,0 m.
Water depth318,0 m
Total depth4 223,0 m MD
Vertical depth1 579,9 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud28.07.1999
Completed12.08.1999
OperatorNorsk Hydro Produksjon AS
Position60,7559 N, 3,6397 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-K-23 BY1H same well | 0,0 | 6 918,0 | - | - | 2013 |
| 31/2-K-23 BY2H same well | 0,0 | 5 421,0 | - | - | 2013 |
| 31/2-K-23 H same well | 0,0 | 1 815,0 | - | - | 1999 |
| 31/2-K-24 Y1H | 0,0 | 5 532,0 | - | - | 2004 |
| 31/2-K-24 Y2H | 0,0 | 5 803,0 | - | - | 2004 |
| 31/2-K-24 Y3H | 0,0 | 6 338,0 | - | - | 2004 |
| 31/2-K-24 Y4H | 0,0 | 5 255,0 | - | - | 2004 |
| 31/2-K-21 AY1H | 0,0 | 5 080,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.