31/2-L-11 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 01.10.2000 to 13.10.2000 (12 days), to 2 057,0 m.
Water depth326,0 m
Total depth2 057,0 m MD
Vertical depth1 921,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud01.10.2000
Completed13.10.2000
OperatorNorsk Hydro Produksjon AS
Position60,7851 N, 3,5560 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 63 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-L-11 AH same well | 0,0 | 4 710,0 | - | - | 2000 |
| 31/2-L-11 BY1H same well | 0,0 | 4 967,0 | - | - | 2007 |
| 31/2-L-11 BY2H same well | 0,0 | 4 747,0 | - | - | 2007 |
| 31/2-L-11 CY1H same well | 0,0 | 7 300,0 | - | - | 2015 |
| 31/2-L-11 CY2H same well | 0,0 | 5 670,0 | - | - | 2015 |
| 31/2-L-11 CY3H same well | 0,0 | 6 922,0 | - | - | 2015 |
| 31/2-L-12 Y1H | 0,0 | 5 888,0 | - | - | 2003 |
| 31/2-L-12 Y2H | 0,0 | 6 077,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.