Fields / Troll / 31/2-L-22 AY1H
31/2-L-22 AY1H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 09.10.2002 to 10.11.2002 (32 days), to 4 245,0 m.
Water depth329,0 m
Total depth4 245,0 m MD
Vertical depth1 594,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud09.10.2002
Completed10.11.2002
OperatorNorsk Hydro Produksjon AS
Position60,8088 N, 3,5559 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-L-22 AY2H same well | 0,0 | 5 016,0 | - | - | 2002 |
| 31/2-L-22 BY1H same well | 0,0 | 4 996,0 | - | - | 2014 |
| 31/2-L-22 BY2H same well | 0,0 | 5 448,0 | - | - | 2014 |
| 31/2-L-22 BY3H same well | 0,0 | 6 101,0 | - | - | 2014 |
| 31/2-L-22 BY4H same well | 0,0 | 4 751,0 | - | - | 2015 |
| 31/2-L-22 H same well | 0,0 | 2 690,0 | - | - | 2002 |
| 31/2-L-21 AY1H | 0,0 | 5 120,0 | - | - | 2001 |
| 31/2-L-21 AY2H | 0,0 | 4 575,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.