31/2-M-22 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Vanguard in Troll, 29.01.2001 to 30.03.2001 (60 days), to 5 542,0 m.
Water depth352,0 m
Total depth5 542,0 m MD
Vertical depth1 583,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud29.01.2001
Completed30.03.2001
OperatorNorsk Hydro Produksjon AS
Position60,9315 N, 3,6642 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-M-22 AY1H same well | 0,0 | 5 944,0 | - | - | 2018 |
| 31/2-M-22 AY2H same well | 0,0 | 6 021,0 | - | - | 2018 |
| 31/2-M-22 AY3H same well | 0,0 | 6 800,0 | - | - | 2018 |
| 31/2-M-21 H | 0,0 | 5 231,0 | - | - | 2001 |
| 31/2-M-24 AH | 0,0 | 5 200,0 | - | - | 2009 |
| 31/2-M-24 Y1H | 0,0 | 5 238,0 | - | - | 2006 |
| 31/2-M-24 Y2H | 0,0 | 5 552,0 | - | - | 2009 |
| 31/2-M-24 Y3H | 0,0 | 4 858,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.