31/2-M-23 BY2H

Development, productionPluggedOil

Drilled by Statoil Petroleum AS with Stena Don in Troll, 02.12.2013 to 05.01.2014 (34 days), to 6 555,0 m.

Water depth353,0 m
Total depth6 555,0 m MD
Vertical depth1 599,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud02.12.2013
Completed05.01.2014
OperatorStatoil Petroleum AS
Position60,9314 N, 3,6643 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-M-23 AH same well0,04 520,0--2000
31/2-M-23 BY1H same well0,05 790,0--2013
31/2-M-23 CY1H same well0,08 534,0--2019
31/2-M-23 CY2H same well0,08 550,0--2019
31/2-M-23 CY3H same well0,07 405,0--2019
31/2-M-23 H same well0,02 061,0--2000
31/2-M-24 AH0,05 200,0--2009
31/2-M-24 Y1H0,05 238,0--2006

Casing and formation tests

No casing programme is reported for this wellbore.