Fields / Troll Brent B / 31/2-N-11 H
31/2-N-11 H
Development, observationPluggedOil and gas
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll Brent B, 12.07.2005 to 24.08.2005 (43 days), to 4 275,0 m.
Water depth341,0 m
Total depth4 275,0 m MD
Vertical depth2 091,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud12.07.2005
Completed24.08.2005
OperatorNorsk Hydro Produksjon AS
Position60,9157 N, 3,5865 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
No released well in Troll Brent B reports a bottom-hole temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-N-11 AH same well | 0,0 | 3 452,0 | - | - | 2005 |
| 31/2-N-11 BY1H same well | 0,0 | 5 670,0 | - | - | 2006 |
| 31/2-N-11 BY2H same well | 0,0 | 5 414,0 | - | - | 2006 |
| 31/2-N-11 BY3H same well | 0,0 | 4 790,0 | - | - | 2006 |
| 31/2-N-11 BY4H same well | 0,0 | 5 676,0 | - | - | 2006 |
| 31/2-N-11 BY5H same well | 0,0 | - | - | - | - |
| 31/2-N-11 BY6H same well | 0,0 | - | - | - | - |
| 31/2-N-12 H | 0,0 | 4 880,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.