31/2-N-13 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 28.11.2000 to 07.01.2001 (40 days), to 4 963,0 m.
Water depth341,0 m
Total depth4 963,0 m MD
Vertical depth1 595,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud28.11.2000
Completed07.01.2001
OperatorNorsk Hydro Produksjon AS
Position60,9157 N, 3,5867 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-N-13 AY1H same well | 0,0 | 4 432,0 | - | - | 2011 |
| 31/2-N-13 AY2H same well | 0,0 | 6 641,0 | - | - | 2012 |
| 31/2-N-13 BH same well | 0,0 | 7 893,0 | - | - | 2017 |
| 31/2-N-14 AH | 0,0 | 4 904,0 | - | - | 1999 |
| 31/2-N-14 BY1H | 0,0 | 5 397,0 | - | - | 2013 |
| 31/2-N-14 BY2H | 0,0 | 5 219,0 | - | - | 2013 |
| 31/2-N-14 BY3H | 0,0 | 3 880,0 | - | - | 2013 |
| 31/2-N-14 CY1H | 0,0 | 5 852,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.