WellplannerNorwegian shelf well data

Fields / Troll / 31/2-N-21 Y2H

31/2-N-21 Y2H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Troll, 14.05.2002 to 15.06.2002 (32 days), to 5 500,0 m.

Water depth348,0 m
Total depth5 500,0 m MD
Vertical depth1 583,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud14.05.2002
Completed15.06.2002
OperatorNorsk Hydro Produksjon AS
Position60,9463 N, 3,5803 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient49 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-N-21 AY1H same well0,05 904,0--2014
31/2-N-21 AY2H same well0,05 722,0--2014
31/2-N-21 AY3H same well0,06 173,0--2014
31/2-N-21 AY4H same well0,06 530,0--2014
31/2-N-21 AY5H same well0,02 540,0--2014
31/2-N-21 Y1H same well0,05 006,0--2002
31/2-N-22 AY1H0,06 800,0--2016
31/2-N-22 AY2H0,05 780,0--2016

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗