Fields / Troll / 31/2-O-13 BY2H
31/2-O-13 BY2H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Stena Dee in Troll, 02.03.2006 to 25.03.2006 (23 days), to 4 746,0 m.
Water depth337,0 m
Total depth4 746,0 m MD
Vertical depth1 588,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigStena Dee
Spud02.03.2006
Completed25.03.2006
OperatorNorsk Hydro Produksjon AS
Position60,8896 N, 3,5663 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-O-13 AH same well | 0,0 | 3 833,0 | - | - | 2000 |
| 31/2-O-13 BY1H same well | 0,0 | 5 442,0 | - | - | 2006 |
| 31/2-O-13 CY1H same well | 0,0 | 6 590,0 | - | - | 2016 |
| 31/2-O-13 CY2H same well | 0,0 | 6 895,0 | - | - | 2016 |
| 31/2-O-13 CY3H same well | 0,0 | 6 377,0 | - | - | 2016 |
| 31/2-O-13 H same well | 0,0 | 1 902,0 | - | - | 2000 |
| 31/2-O-14 Y1H | 0,0 | 4 942,0 | - | - | 2004 |
| 31/2-O-14 Y2H | 0,0 | 6 528,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.