WellplannerNorwegian shelf well data

Fields / Troll / 31/2-P-13 H

31/2-P-13 H

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with West Vanguard in Troll, 21.02.1998 to 10.03.1998 (17 days), to 1 967,0 m.

Water depth336,2 m
Total depth1 967,0 m MD
Vertical depth1 669,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud21.02.1998
Completed10.03.1998
OperatorNorsk Hydro Produksjon AS
Position60,8670 N, 3,5579 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient53 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-P-13 AH same well0,04 309,0--1999
31/2-P-13 BY1H same well0,05 230,0--2010
31/2-P-13 BY2H same well0,05 333,0--2010
31/2-P-13 CH same well0,05 664,0--2018
31/2-P-14 AH0,05 102,0--1998
31/2-P-14 BY1H0,04 979,0--2007
31/2-P-14 BY2H0,04 813,0--2007
31/2-P-14 BY3H0,05 757,0--2007

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗