WellplannerNorwegian shelf well data

Fields / Troll / 31/2-P-23 Y1H

31/2-P-23 Y1H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Ocean Vanguard in Troll, 06.02.2003 to 31.03.2003 (53 days), to 4 916,0 m.

Water depth339,0 m
Total depth4 916,0 m MD
Vertical depth1 584,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigOcean Vanguard
Spud06.02.2003
Completed31.03.2003
OperatorNorsk Hydro Produksjon AS
Position60,8765 N, 3,4944 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-P-23 AY1H same well0,06 756,0--2017
31/2-P-23 AY2H same well0,07 199,0--2017
31/2-P-23 AY3H same well0,07 125,0--2017
31/2-P-23 BY1H same well0,07 224,0--2022
31/2-P-23 BY2H same well0,07 201,0--2022
31/2-P-23 BY3H same well0,07 517,0--2022
31/2-P-23 Y2H same well0,05 140,0--2003
31/2-P-23 Y3H same well0,04 160,0--2003

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗