31/2-P-41
Development, observationPlugged and abandoned
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 30.10.1997 to 14.11.1997 (15 days), to 1 725,0 m.
Water depth338,0 m
Total depth1 725,0 m MD
Vertical depth1 725,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud30.10.1997
Completed14.11.1997
OperatorNorsk Hydro Produksjon AS
Position60,8865 N, 3,5227 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 55 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-P-24 AH | 1,9 | 3 930,0 | - | - | 2012 |
| 31/2-P-24 BY1H | 1,9 | 5 000,0 | - | - | 2012 |
| 31/2-P-24 BY2H | 1,9 | 6 850,0 | - | - | 2013 |
| 31/2-P-24 BY3H | 1,9 | 7 158,0 | - | - | 2013 |
| 31/2-P-24 CY1H | 1,9 | 7 983,0 | - | - | 2019 |
| 31/2-P-24 CY2H | 1,9 | 7 680,0 | - | - | 2019 |
| 31/2-P-24 CY3H | 1,9 | 6 768,0 | - | - | 2019 |
| 31/2-P-24 Y1H | 1,9 | 6 611,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.