WellplannerNorwegian shelf well data

Fields / Troll / 31/2-P-41

31/2-P-41

Development, observationPlugged and abandoned

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 30.10.1997 to 14.11.1997 (15 days), to 1 725,0 m.

Water depth338,0 m
Total depth1 725,0 m MD
Vertical depth1 725,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud30.10.1997
Completed14.11.1997
OperatorNorsk Hydro Produksjon AS
Position60,8865 N, 3,5227 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient55 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-P-24 AH1,93 930,0--2012
31/2-P-24 BY1H1,95 000,0--2012
31/2-P-24 BY2H1,96 850,0--2013
31/2-P-24 BY3H1,97 158,0--2013
31/2-P-24 CY1H1,97 983,0--2019
31/2-P-24 CY2H1,97 680,0--2019
31/2-P-24 CY3H1,96 768,0--2019
31/2-P-24 Y1H1,96 611,0--2005

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗