31/2-Q-12 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Troll, 23.12.1999 to 20.01.2000 (28 days), to 1 982,0 m.
Water depth336,0 m
Total depth1 982,0 m MD
Vertical depth1 883,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud23.12.1999
Completed20.01.2000
OperatorNorsk Hydro Produksjon AS
Position60,8446 N, 3,6273 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 61 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-Q-12 AH same well | 0,0 | 4 768,0 | - | - | 2000 |
| 31/2-Q-12 BH same well | 0,0 | 6 068,0 | - | - | 2011 |
| 31/2-Q-11 AH | 0,0 | 2 685,0 | - | - | 1999 |
| 31/2-Q-11 BY1H | 0,0 | 5 610,0 | - | - | 2003 |
| 31/2-Q-11 BY2H | 0,0 | 3 998,0 | - | - | 2003 |
| 31/2-Q-11 BY3H | 0,0 | 4 742,0 | - | - | 2003 |
| 31/2-Q-11 CY1H | 0,0 | 6 422,0 | - | - | 2016 |
| 31/2-Q-11 CY2H | 0,0 | 6 475,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.