31/2-W-31 H
Development, productionClosed
Drilled by Equinor Energy AS with Deepsea Aberdeen in Troll, 24.02.2026 to 20.03.2026 (24 days), to 1 650,0 m.
Water depth333,0 m
Total depth1 650,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Aberdeen
Spud24.02.2026
Completed20.03.2026
OperatorEquinor Energy AS
Position60,8384 N, 3,5524 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 52 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-W-34 H | 0,0 | 1 626,0 | - | - | 2026 |
| 31/2-W-32 H | 0,0 | 1 682,0 | - | - | 2026 |
| 31/2-W-33 H | 0,0 | 1 665,0 | - | - | 2026 |
| 31/2-Y-23 AH | 1,4 | 4 979,0 | - | - | 2000 |
| 31/2-Y-23 BY1H | 1,4 | 1 902,0 | - | - | 2010 |
| 31/2-Y-23 BY2H | 1,4 | - | - | - | - |
| 31/2-Y-23 CY1H | 1,4 | 4 403,0 | - | - | 2010 |
| 31/2-Y-23 CY2H | 1,4 | 4 948,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.