31/2-W-41 H
Development, productionProducing
Drilled by Equinor Energy AS with Deepsea Aberdeen in Troll, 07.12.2025 to 13.04.2026 (127 days), to 1 670,5 m.
Water depth333,0 m
Total depth1 670,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Aberdeen
Spud07.12.2025
Completed13.04.2026
OperatorEquinor Energy AS
Position60,8391 N, 3,5834 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 53 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-W-44 H | 0,0 | 1 657,5 | - | - | 2025 |
| 31/2-W-42 H | 0,0 | 1 538,0 | - | - | 2025 |
| 31/2-W-43 H | 0,0 | 1 599,0 | - | - | 2025 |
| 31/2-3 | 0,3 | 2 601,0 | 73 °C | 1,32 | 1980 |
| 31/2-Y-21 AY1H | 1,1 | 7 479,0 | - | - | 2017 |
| 31/2-Y-21 AY2H | 1,1 | 7 913,0 | - | - | 2017 |
| 31/2-Y-21 AY3H | 1,1 | 7 593,0 | - | - | 2017 |
| 31/2-Y-21 Y1H | 1,1 | 4 849,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.