31/2-X-12 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 17.08.2002 to 17.09.2002 (31 days), to 5 382,0 m.
Water depth334,0 m
Total depth5 382,0 m MD
Vertical depth1 591,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud17.08.2002
Completed17.09.2002
OperatorNorsk Hydro Produksjon AS
Position60,8325 N, 3,6041 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-X-12 AH same well | 0,0 | 4 837,0 | - | - | 2007 |
| 31/2-X-11 AH | 0,0 | 4 837,0 | - | - | 2001 |
| 31/2-X-11 BY1H | 0,0 | 5 040,0 | - | - | 2011 |
| 31/2-X-11 BY2H | 0,0 | 4 944,0 | - | - | 2011 |
| 31/2-X-11 CH | 0,0 | 6 855,0 | - | - | 2018 |
| 31/2-X-11 H | 0,0 | 2 218,0 | - | - | 2001 |
| 31/2-X-14 AY1H | 0,0 | 5 208,0 | - | - | 2001 |
| 31/2-X-14 AY2H | 0,0 | 5 238,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.