31/2-X-14 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 11.08.2001 to 25.08.2001 (14 days), to 2 495,0 m.
Water depth334,0 m
Total depth2 495,0 m MD
Vertical depth1 743,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud11.08.2001
Completed25.08.2001
OperatorNorsk Hydro Produksjon AS
Position60,8325 N, 3,6039 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 55 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-X-14 AY1H same well | 0,0 | 5 208,0 | - | - | 2001 |
| 31/2-X-14 AY2H same well | 0,0 | 5 238,0 | - | - | 2001 |
| 31/2-X-14 BY1H same well | 0,0 | 5 759,0 | - | - | 2015 |
| 31/2-X-14 BY2H same well | 0,0 | 5 795,0 | - | - | 2015 |
| 31/2-X-14 BY3H same well | 0,0 | 6 025,0 | - | - | 2015 |
| 31/2-X-14 CH same well | 0,0 | 5 801,0 | - | - | 2018 |
| 31/2-X-13 AY1H | 0,0 | 5 225,0 | - | - | 2014 |
| 31/2-X-13 AY2H | 0,0 | 5 525,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.