Fields / Troll / 31/2-X-23 Y4H
31/2-X-23 Y4H
Development, productionWill never be drilled
A planned wellbore in Troll that the register says will never be drilled.
Water depth329,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigDeepsea Trym
Spud-
Completed-
OperatorNorsk Hydro Produksjon AS
Position60,8081 N, 3,5931 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-X-23 Y1H same well | 0,0 | 4 513,0 | - | - | 2006 |
| 31/2-X-23 Y2H same well | 0,0 | 7 076,0 | - | - | 2006 |
| 31/2-X-23 Y3H same well | 0,0 | 7 230,0 | - | - | 2006 |
| 31/2-X-24 AH | 0,0 | 4 848,0 | - | - | 2001 |
| 31/2-X-24 H | 0,0 | 2 003,0 | - | - | 2001 |
| 31/2-X-21 AY1H | 0,0 | 6 415,0 | - | - | 2013 |
| 31/2-X-21 AY2H | 0,0 | 6 028,0 | - | - | 2013 |
| 31/2-X-21 BY1H | 0,0 | 7 219,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.