Fields / Troll / 31/2-Y-22 Y1H
31/2-Y-22 Y1H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Vanguard in Troll, 08.11.2000 to 15.12.2000 (37 days), to 4 807,0 m.
Water depth333,0 m
Total depth4 807,0 m MD
Vertical depth1 580,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud08.11.2000
Completed15.12.2000
OperatorNorsk Hydro Produksjon AS
Position60,8310 N, 3,5727 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-Y-22 AY1H same well | 0,0 | 5 313,0 | - | - | 2016 |
| 31/2-Y-22 AY2H same well | 0,0 | 5 347,0 | - | - | 2016 |
| 31/2-Y-22 AY3H same well | 0,0 | 6 377,0 | - | - | 2016 |
| 31/2-Y-22 AY4H same well | 0,0 | 4 316,0 | - | - | 2016 |
| 31/2-Y-22 Y2H same well | 0,0 | 4 510,0 | - | - | 2000 |
| 31/2-Y-21 AY1H | 0,0 | 7 479,0 | - | - | 2017 |
| 31/2-Y-21 AY2H | 0,0 | 7 913,0 | - | - | 2017 |
| 31/2-Y-21 AY3H | 0,0 | 7 593,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.