31/3-Q-21 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Scarabeo 6 in Troll, 27.04.2001 to 20.05.2001 (23 days), to 2 018,0 m.
Water depth340,0 m
Total depth2 018,0 m MD
Vertical depth1 814,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud27.04.2001
Completed20.05.2001
OperatorNorsk Hydro Produksjon AS
Position60,8320 N, 3,7165 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 58 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/3-Q-21 AY1H same well | 0,0 | 5 532,0 | - | - | 2004 |
| 31/3-Q-21 AY2H same well | 0,0 | 4 243,0 | - | - | 2004 |
| 31/3-Q-21 BY1H same well | 0,0 | 6 365,0 | - | - | 2007 |
| 31/3-Q-21 BY2H same well | 0,0 | 6 060,0 | - | - | 2008 |
| 31/3-S-41 | 1,5 | 1 755,0 | - | - | 1998 |
| 31/3-2 | 4,7 | 2 090,0 | 73 °C | 1,37 | 1984 |
| 31/2-Q-12 AH | 5,0 | 4 768,0 | - | - | 2000 |
| 31/2-Q-12 BH | 5,0 | 6 068,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.