31/4-A-21 A
Development, productionProducingOil
Drilled by OKEA ASA with Brage in Brage, 14.02.2024 to 25.03.2024 (40 days), to 6 501,0 m.
Water depth139,6 m
Total depth6 501,0 m MD
Vertical depth2 361,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigBrage
Spud14.02.2024
Completed25.03.2024
OperatorOKEA ASA
Position60,5426 N, 3,0475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 94 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-21 same well | 0,0 | 4 870,0 | - | - | 1995 |
| 31/4-A-38 | 0,0 | 4 094,0 | - | - | 1999 |
| 31/4-A-17 | 0,0 | 3 985,0 | - | - | 1996 |
| 31/4-A-17 A | 0,0 | 5 541,0 | - | - | 1996 |
| 31/4-A-17 BY1 | 0,0 | 3 426,0 | - | - | 2003 |
| 31/4-A-17 BY2 | 0,0 | 3 865,0 | - | - | 2003 |
| 31/4-A-17 BY3 | 0,0 | 5 014,0 | - | - | 2003 |
| 31/4-A-14 | 0,0 | 5 494,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.