31/4-A-28 A
Development, observationPluggedOil
Drilled by Norsk Hydro Petroleum AS with Brage in Brage, 07.09.2007 to 19.12.2007 (103 days), to 6 895,0 m.
Water depth136,9 m
Total depth6 895,0 m MD
Vertical depth2 395,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigBrage
Spud07.09.2007
Completed19.12.2007
OperatorNorsk Hydro Petroleum AS
Position60,5426 N, 3,0475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 95 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-28 same well | 0,0 | 5 778,0 | - | - | 1995 |
| 31/4-A-28 B same well | 0,0 | 7 453,0 | - | - | 2007 |
| 31/4-A-28 C same well | 0,0 | 5 555,0 | - | - | 2024 |
| 31/4-A-28 D same well | 0,0 | 8 787,0 | - | - | 2024 |
| 31/4-A-36 | 0,0 | 4 663,0 | - | - | 1998 |
| 31/4-A-36 A | 0,0 | 8 253,0 | - | - | 2019 |
| 31/4-A-36 B | 0,0 | 9 023,0 | - | - | 2019 |
| 31/4-A-3 | 0,0 | 3 580,0 | - | - | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.