31/4-A-7
Development, injectionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Brage in Brage, 21.02.1994 to 10.04.1994 (48 days), to 4 835,0 m.
Water depth136,9 m
Total depth4 835,0 m MD
Vertical depth2 545,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigBrage
Spud21.02.1994
Completed10.04.1994
OperatorNorsk Hydro Produksjon AS
Position60,5426 N, 3,0474 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-7 A same well | 0,0 | 6 842,0 | - | - | 2015 |
| 31/4-A-7 B same well | 0,0 | 6 601,0 | - | - | 2015 |
| 31/4-A-40 | 0,0 | 5 822,0 | - | - | 1995 |
| 31/4-A-40 A | 0,0 | 5 865,0 | - | - | 2007 |
| 31/4-A-40 B | 0,0 | 6 844,0 | - | - | 2007 |
| 31/4-A-40 C | 0,0 | 9 247,0 | - | - | 2023 |
| 31/4-A-31 | 0,0 | 8 116,0 | - | - | 2004 |
| 31/4-A-14 | 0,0 | 5 494,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.