Fields / 31/4-U-4
31/4-U-4
Other, soil drillingPlugged and abandoned
Drilled by Norsk Hydro Produksjon AS, 02.10.1987 to 03.10.1987 (1 days), to 91,0 m.
Water depth-
Total depth91,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
Rig-
Spud02.10.1987
Completed03.10.1987
OperatorNorsk Hydro Produksjon AS
Position60,5423 N, 3,0467 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-13 | 0,0 | 3 803,0 | - | - | 1994 |
| 31/4-A-13 A | 0,0 | 4 894,0 | - | - | 2009 |
| 31/4-A-13 B | 0,0 | 4 600,0 | - | - | 2009 |
| 31/4-A-13 C | 0,0 | 7 799,0 | - | 1,55 | 2022 |
| 31/4-A-13 D | 0,0 | 8 501,0 | - | - | 2023 |
| 31/4-A-13 E | 0,0 | 9 050,0 | - | - | 2023 |
| 31/4-A-13 F | 0,0 | 7 571,0 | - | - | 2023 |
| 31/4-A-9 | 0,0 | 6 602,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.