31/5-H-1 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 01.05.1996 to 26.05.1996 (25 days), to 4 771,0 m.
Water depth316,0 m
Total depth4 771,0 m MD
Vertical depth1 602,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud01.05.1996
Completed26.05.1996
OperatorNorsk Hydro Produksjon AS
Position60,7161 N, 3,5109 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-H-1 BY1H same well | 0,0 | 5 891,0 | - | - | 2019 |
| 31/5-H-1 BY2H same well | 0,0 | 7 114,0 | - | - | 2019 |
| 31/5-H-1 BY3H same well | 0,0 | 6 086,0 | - | - | 2019 |
| 31/5-H-1 BY4H same well | 0,0 | 5 845,0 | - | - | 2019 |
| 31/5-H-1 H same well | 0,0 | 2 400,0 | - | - | 1996 |
| 31/5-H-4 AY1H | 0,2 | 4 297,0 | - | - | 2017 |
| 31/5-H-4 AY2H | 0,2 | 6 635,0 | - | - | 2017 |
| 31/5-H-4 AY3H | 0,2 | 7 083,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.