31/5-H-2 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 26.11.1996 to 23.12.1996 (27 days), to 4 260,0 m.
Water depth315,5 m
Total depth4 260,0 m MD
Vertical depth1 580,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud26.11.1996
Completed23.12.1996
OperatorNorsk Hydro Produksjon AS
Position60,7303 N, 3,5132 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-H-2 AH same well | 0,0 | 3 500,0 | - | - | 2005 |
| 31/5-H-2 BY1H same well | 0,0 | 5 277,0 | - | - | 2005 |
| 31/5-H-2 BY2H same well | 0,0 | 5 188,0 | - | - | 2005 |
| 31/5-H-2 BY3H same well | 0,0 | 5 793,0 | - | - | 2005 |
| 31/5-H-2 CY1H same well | 0,0 | 4 150,0 | - | - | 2013 |
| 31/5-H-2 CY2H same well | 0,0 | 4 394,0 | - | - | 2014 |
| 31/5-H-2 CY3H same well | 0,0 | 5 485,0 | - | - | 2014 |
| 31/5-Z-1 H | 1,1 | 1 760,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.