Fields / Troll / 31/5-I-12 Y2H
31/5-I-12 Y2H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 06.02.2002 to 18.02.2002 (12 days), to 4 777,0 m.
Water depth317,0 m
Total depth4 777,0 m MD
Vertical depth1 584,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud06.02.2002
Completed18.02.2002
OperatorNorsk Hydro Produksjon AS
Position60,7410 N, 3,5818 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-12 AY1H same well | 0,0 | 5 683,0 | - | - | 2012 |
| 31/5-I-12 AY2H same well | 0,0 | 6 250,0 | - | - | 2012 |
| 31/5-I-12 BY1H same well | 0,0 | 8 707,0 | - | - | 2020 |
| 31/5-I-12 BY2H same well | 0,0 | 6 397,0 | - | - | 2020 |
| 31/5-I-12 BY3H same well | 0,0 | 8 770,0 | - | - | 2021 |
| 31/5-I-12 Y1H same well | 0,0 | 4 906,0 | - | - | 2002 |
| 31/5-I-11 AH | 0,0 | 4 436,0 | - | - | 1998 |
| 31/5-I-11 BY1H | 0,0 | 7 124,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.