Fields / Troll / 31/5-I-14 BY1H
31/5-I-14 BY1H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 19.04.2005 to 14.05.2005 (25 days), to 5 047,0 m.
Water depth317,0 m
Total depth5 047,0 m MD
Vertical depth1 597,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud19.04.2005
Completed14.05.2005
OperatorNorsk Hydro Produksjon AS
Position60,7410 N, 3,5816 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-14 AH same well | 0,0 | 4 633,0 | - | - | 1998 |
| 31/5-I-14 BY2H same well | 0,0 | 5 839,0 | - | - | 2005 |
| 31/5-I-14 BY3H same well | 0,0 | 5 547,0 | - | - | 2005 |
| 31/5-I-14 BY4H same well | 0,0 | 4 913,0 | - | - | 2005 |
| 31/5-I-14 BY5H same well | 0,0 | 7 703,0 | - | - | 2005 |
| 31/5-I-14 CY1H same well | 0,0 | 4 535,0 | - | - | 2015 |
| 31/5-I-14 CY2H same well | 0,0 | 4 991,0 | - | - | 2015 |
| 31/5-I-14 CY3H same well | 0,0 | 4 878,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.