WellplannerNorwegian shelf well data

Fields / Troll / 31/5-J-13 AY2H

31/5-J-13 AY2H

Development, productionPluggedOil

Drilled by StatoilHydro Petroleum AS with Songa Dee in Troll, 07.02.2009 to 14.02.2009 (7 days), to 4 565,0 m.

Water depth315,0 m
Total depth4 565,0 m MD
Vertical depth1 583,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigSonga Dee
Spud07.02.2009
Completed14.02.2009
OperatorStatoilHydro Petroleum AS
Position60,7433 N, 3,6079 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-J-13 AY1H same well0,04 556,0--2009
31/5-J-13 AY3H same well0,04 904,0--2009
31/5-J-13 BY1H same well0,07 292,0--2015
31/5-J-13 BY2H same well0,05 946,0--2016
31/5-J-13 BY3H same well0,06 496,0--2016
31/5-J-13 H same well0,04 824,0--1999
31/5-J-14 AY1H0,04 794,0--2011
31/5-J-14 AY2H0,04 975,0--2011

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗